To help Wagstaff Piling prevent groundwater flooding whilst constructing the 2 level basement along the banks of the Parramatta River, AUSREO prefabricated custom steel cages for the reinforced concrete diaphragm walls.

Prefabricating the diaphragm walls in a controlled factory environment eliminated the quality and safety issues typically associated with on-site manufacturing.

PROTOTYPE SPEEDS CONSTRUCTION TIME

AUSREO manufactured a prototype diaphragm wall panel to be inspected for constructability and site handling requirements prior to project start.

Once the 2.3m wide x 8.7m deep prototype panel was approved, AUSREO manufactured and delivered 194 panels in 8 weeks.

CUSTOM BUILT FOR THE PROJECT

The prefabrication team worked with Wagstaff Piling from the early design stages to develop a prefabricated diaphragm wall solution that exceeded quality and time expectations.